PERMIT FEES FOR THE 2006 INTERNATIONAL BUILDING, MECHANICAL, PLUMBING CODE AND 2008 NATIONAL ELECTRIC CODE

BUILDING: Fees are based on building valuations, which shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official the valuation is underestimated on the application, the applicant may need to show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. Please call the office for an estimated fee based on your building valuation.

PLUMBING AND MECHANICAL:

Permit Fee = Building Valuation X .10 X .0075
(Minimum $50.00)
Permit Fee Without Building Valuation or with disproportionate
mechanical/plumbing Valuation = .0075 X Mech/Plumb Valuation
(Minimum $50.00)
Plan Review Fees = 65% of Permit Fee
Reinspection Fee = $65.00

ELECTRICAL:

RESIDENTIAL = This fee includes construction of, or remodeling of, or additions to: Single family homes, Modular homes, Duplexes, Condominiums, and Townhomes, (based on the enclosed living area).

UNIT AREA PERMIT FEE
Not more than 1000 sf $52.00
1001 sf and not more than 1500 sf $58.00
1501 sf and not more than 2000 sf $86.00
Per 100 sf in excess of 2000 sf $4.50

ALL OTHER FEES, except for inspections in mobile homes and travel parks,
shall be computed on the dollar value of the electrical installation, including
time and material (total cost to customer), and such fees shall be computed
as follows:
Not more than $300 $52.00
$300, but not more than $2000 $58.00
$2001, but not more than $50,000 $22.00 per thousand or fraction thereof
$50,001, but not more than $500,000 $21.00 per thousand or fraction thereof PLUS $50.00
More than $500,000 $20.00 per thousand or fraction thereof PLUS $550.00
Mobile Home Parks and Travel Parks per space $52.00
All Calculations Round Up to Nearest Thousand
Reinspection on Electrical Inspections $65.00
Plan Review Fee = 65% of Permit Fee Temporary Power Permit = $52.00
Hot Tub Electrical Permit = $52.00


If a permit is not filed in advance of the commencement of an installation, or construction work, the permit fee shall be twice the amount prescribed.


Telephone:
970.668.3170
FAX: 970.668.4255
Postal address: PO Box 5660, Frisco, CO, 80443
Physical address: 37 Peak One Drive, County Road 1005, Frisco, CO, 80443
Electronic mail: bidepartment@co.summit.co.us